3 versions, each boost different functions and using method
Our C_TS420_1709 quiz torrent boost 3 versions and they include PDF version, PC version, App online version. Different version boosts different functions and using method. For example, the PDF version is convenient for the download and printing our C_TS420_1709 exam torrent and is easy and suitable for browsing learning. It can be printed on the papers which are convenient for you to take notes and learn at any time and place. You can practice C_TS420_1709 quiz prep repeatedly and there are no limits for the amount of the persons and times. And the PC version of C_TS420_1709 quiz torrent can stimulate the real exam's scenarios, is stalled on the Windows operating system and runs on the Java environment. You can use it any time to test your own Exam stimulation tests scores and whether you have mastered our C_TS420_1709 exam torrent.
There are many other advantages. To gain a full understanding of our product please firstly look at the introduction of the features and the functions of our C_TS420_1709 exam torrent. The page of our product provide the demo and the aim to provide the demo is to let the you understand part of our titles before their purchase and see what form the software is after the you open it. The client can visit the page of our product on the website. So the client can understand our C_TS420_1709 quiz torrent well and decide whether to buy our product or not at their wishes. The client can see the forms of the answers and the titles.
Refund you in full at one time immediately if you fail in the exam
If you fail in the exam with our C_TS420_1709 quiz prep we will refund you in full at one time immediately. If only you provide the proof which include the exam proof and the scanning copy or the screenshot of the failure marks we will refund you immediately. If any problems or doubts about our C_TS420_1709 exam torrent exist, please contact our customer service personnel online or contact us by mails and we will reply you and solve your doubts immediately. The C_TS420_1709 quiz prep we sell boost high passing rate and hit rate so you needn't worry that you can't pass the exam too much. But if you fail in please don't worry we will refund you. Take it easy before you purchase our C_TS420_1709 quiz torrent.
Vigorous protection of the client's privacy information
Many clients may worry that their privacy information will be disclosed while purchasing our C_TS420_1709 quiz torrent. We promise to you that our system has set vigorous privacy information protection procedures and measures and we won't sell your privacy information. Before you buy our product, you can download and try out it freely so you can have a good understanding of our C_TS420_1709 quiz prep. Please feel safe to purchase our C_TS420_1709 exam torrent any time as you like. We provide the best service to the client and hope the client can be satisfied.
SAP C_TS420_1709 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Master Data in SAP S/4HANA | 8%-12% | - Material master, BOM, and routing - MRP areas and plant parameters - Work centers and production versions |
| Lean Manufacturing and Kanban | <8% | - Kanban setup and control cycle - Repetitive manufacturing |
| Production Orders in SAP ERP | >12% | - Availability check and material staging - Order status management - Routing selection and order confirmation - BOM item categories |
| Introduction to SAP S/4HANA | 8%-12% | - S/4HANA simplifications and innovations - SAP Fiori UX and embedded analytics - SAP HANA database architecture |
| Material Requirements Planning in SAP ERP | >12% | - MRP basics and run steps - Long-term planning and master production scheduling - Lot-sizing procedures - Planning strategies |
| Demand Management | 8%-12% | - Planned independent requirements - Consumption-based planning - Make-to-stock and make-to-order strategies |
| Advanced Planning in SAP S/4HANA | >12% | - Detailed scheduling processes - Alert monitor and planning board - Advanced planning concepts and master data |
| Integration with Other Modules | <8% | - Integration with Finance and Controlling - Integration with Sales and Distribution |
| Capacity Planning | 8%-12% | - Work center capacity checks - Capacity availability check - Capacity evaluation and leveling |
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) Sample Questions:
1. A planner updated a production order status from partially confirmed "PCNF" to technically completed
"TECO" by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:
A) The production operator cannot enter additional confirmations
B) The warehouse clerk still carry out goods issue transactions
C) The buyer can still see component reservations
D) The production manager can still see the capacity requirements
2. In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
Please choose the correct answer.
Response:
A) Production version
B) Bill of material
C) Cost collector
D) Repetitive manufacturing profile
3. The production plan is being disrupted by last minute demands that are entered in the system. Which is
the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:
A) In the material master record, set MRP type to P4 and a planning time fence on the replenishment
lead time of the material
B) Manually firm all planned orders for materials within the replenishment lead time of the material
C) In the material master record, set MRP type to P1 and a planning time fence on the replenishment
lead time of the material
D) In the stock requirements list, set a manual firming fence for a date based on the replenishment lead
time of the material
4. At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused
the message to be generated?
Please choose the correct answer.
Response:
A) A firmed planned receipt cannot be rescheduled
B) The requirements date occurs that of a firmed planned receipt
C) The requirement no longer exists
D) The requirements date occurs before that of a firmed planned receipt
5. For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.
Response:
A) Plant
B) Production version
C) Material
D) Work center
Solutions:
| Question # 1 Answer: A | Question # 2 Answer: A | Question # 3 Answer: B,D | Question # 4 Answer: D | Question # 5 Answer: C,D |